Assays

What is an Assay?
1 Assay visible to you, out of a total of 1

Validation: Validated against the original running in Excel. Each calculation in the model was individually validated as well. Comments on numerical integration: Euler integration with time steps of 1. In Simile the "time units" were set to "day" and execution was for 364 days as the simulation starts at time 0 (not time 1 as in the Excel model). Comments on running Simile model: Users must specify the temperature controlled growing season themselves. To do this use the following steps which take ...

Powered by
(v.1.15.0-pre)
Copyright © 2008 - 2024 The University of Manchester and HITS gGmbH